Baytown flex warehouse storm recovery
Emergency dry-in after hurricane winds peeled the perimeter, then a full TPO replacement.
- Area
- 74,800 sq ft
- Duration
- 6 weeks
- System
- TPO
- Location
- Baytown
Before and after


Drag the handle to compare. Photos are representative samples.
The challenge
Wind uplift removed 9,000 sq ft of membrane and exposed tenant inventory overnight.
Our approach
- Dry-in completed within 20 hours of the first call
- Drone mapping and core samples for the claim file
- Met adjuster on site with the damage report
- New ES-1 edge metal with enhanced corner fastening
They were on the roof before the rain stopped and had the report ready for our adjuster by Monday.
More case studies
Other recent work across Greater Houston.
Start a project like this
We have installed tpo membrane on buildings like yours. Let us survey the roof.
Free roof survey · Written proposal in 5 to 7 business days (sample)




